When Prof. Nkem sent funds from London to start building his mother’s retirement bungalow in Asaba, he didn’t expect shock after shock.
* Tiles he priced at ₦9,500 suddenly cost ₦15,000.
* Generators guzzled diesel daily because the community transformer failed.
* The contractor kept asking for “additional money.”
This was his first experience experiencing and managing construction challenges in Nigeria!

What began as joy became frustration — the kind that causes many diaspora investors to abandon projects mid-way.
But what if Nkem’s experience could be different for you?
That’s why today, we unpack two of the biggest enemies of building in Nigeria — and how Mega Labourers Services helps you overcome them.
READ MORE: Building in Nigeria from Abroad? Here’s How to Win — Not Lose
🔥 Challenge 1: Managing Construction Challenges in Nigeria — Cost Overruns & Material Price Shocks
The Problem:
Budgets swell without warning — cement rises, tiles jump, labour demands increase, exchange rates distort material pricing.
Diaspora investors often receive endless “please send more” messages.
Why It Happens:
Nigeria faces inflation, unstable foreign exchange, supply chain delays, and imported material dependence — turning price spikes into daily reality.

Diaspora investor reacting to rising construction material prices and unexpected building cost increases in Nigeria
✨ What You Can Do
✔ Builds 10–20% contingency planning into project budgets
✔ Uses bulk purchasing & price locking for critical materials
✔ Recommends locally available alternatives where quality fits
✔ Uses modular & hybrid systems to reduce waste and rework
✔ Ensures milestone-based payments tied to actual deliverables
With the right team, every naira is monitored like an investment — not a donation.
🔥 Challenge 2: Managing Construction Challenges in Nigeria — Poor Infrastructure & Delayed Schedules
The Problem:
Sites without power, water, or accessible road networks slow projects, inflate costs, and frustrate deadlines.
Why It Happens:
Secondary cities often lack reliable utilities and logistics, forcing contractors to improvise — at your expense.

Nigerian construction site with poor road access and unstable power supply showing infrastructure challenges in secondary cities.
✨ What You Can Do
✔ Designs resilient building plans with temporary infrastructure
✔ Implements site water security and controlled logistics
✔ Schedules deliveries smartly around weather and access windows
✔ Works with local authorities to improve site accessibility
The result?
Your project moves — even when the environment tries to slow it down.
💡 The Mega Labourers Advantage
At Mega Labourers Services, we don’t just build structures — we build predictability, accountability, and peace of mind.

Mega Labourers engineers installing modular precast panels to reduce waste, speed up construction, and manage project risks
While others react, we plan, monitor, and optimize, ensuring your dream turns into concrete, not chaos.
IN OTHER NEWS: Remote Oversight, Digital Access & Transparency: Redefining Facility Management for Nigerians at Home and Abroad
📌 Ready to Build Without Regrets?
Whether you’re building from Lagos or Los Angeles, Port Harcourt or Port Harcourt County — you don’t have to suffer the story Prof. Nkem lived.
Let Mega Labourers Services help you build faster, smarter and without regret.
📍 CONTACT MEGA LABOURERS SERVICES TODAY
🌐 Website: https://megalabourers.com
📧 Email: hello@megalabourers.com
🏢 Visit Us:
Nigeria — 9 Moses Adebajo Street, Ojodu-Berger, Lagos
USA — 8500 Frederickburgs Lane, Houston TX 77083Canada — 102-30 El-Tassi Drive, Winnipeg MB
📞 Call Us:
Canada: +1 (431) 990-3777
USA: +1 (832) 847-5261
Nigeria: +234 707 491 3626 | +234 707 491 3631

